This browser is too old for the tool

The climate risk tool needs a browser released after mid-2020 — Chrome or Edge 84, Firefox 75, or Safari 14.1 and later. Please open it in a more recent browser.

If you are on a managed corporate device and cannot update, email tristram@afterusadvisory.com and we will run the assessment with you.

Assessing
SSP2-4.5 · 2050s
Current trajectory · 2.0 °C
Your sites 0
Map data © OpenStreetMap contributors · address search by Nominatim ·

Portfolio

Add at least one site before you can see a portfolio view.

Operational risk

Climate risk does not stop at the fence line. This page covers the people who cannot get to work, the supplier whose plant floods, the port that closes and the grid that fails in a heatwave. Every section is optional, partial answers still produce useful output, and you can work here without mapping a single site.

Workforce

Suppliers

Concentrate on inputs you could not quickly replace. Ten well-chosen suppliers tell you more than a hundred.

Logistics

Ports, airports, rail terminals, distribution hubs, border crossings — the places freight must pass through.

Utilities and services

How dependent are operations on each, and how much resilience do you already hold?

Markets and head office

Head office

Anchors utility and demand risk. Defaults to your first mapped site.

Operational risks identified

Report and downloads

Summary deck

An AfterUs-branded PowerPoint covering scope, method, portfolio position, top risks, the hazard picture and your adaptation plan. Built for taking to a Board.

Risk register

The full register as a spreadsheet, with likelihood, consequence, exposure change, confidence and your own owners and actions.

Project file

Everything you have entered, so you can reopen and update the assessment later — or send it to us to take further.

Where AfterUs can help next

This screen tells you which sites and which hazards deserve real analysis. Turning that into a decision your Board can fund is the work we do.

01

Detailed site assessment

Downscaled projections, hydraulic and geotechnical review, and defensible loss estimates for the sites this screen has flagged.

02

Adaptation strategy and business case

Costed options, adaptation pathways with decision triggers, and the investment case to take to your Board.

03

Disclosure and assurance

Physical risk analysis that stands up under IFRS S2, CSRD and TCFD-aligned reporting, and under audit.

Send us this assessment. If you would like us to look at it, save the project file and email it over. We will come back with an initial read on what matters and what it would take to do properly — no charge for that conversation.
afterusadvisory.com